Plumbing, Gas and Electrical permit applications must be picked up at city hall lower level between 8:00 AM.-12:00 PM. Monday-Friday
Plumbing and Gas Inspections
Gary Downs, Plumbing and Gas Inspector
978-465-8835 -
Call Monday through Thursday between 7:00 - 8:00 a.m. daily
Inspections are conducted Mondays, Wednesdays & Thursdays.
All plumbing and gas fitting installations are controlled through enforcement of the Commonwealth of Massachusetts State Uniform Plumbing and Gas Code, formulated by the Board of State Examiners of Plumbers and Gas Fitters under authority of Chapter 142 of the General Laws of the Commonwealth of Massachusetts.
Electrical Inspections
David Zinck, Electrical Inspector
978-465-1769 , call between 7:00 AM.-8:00 AM. Inspections are conducted Mondays, Wednesdays & Fridays only.
Gas & Plumbing Permit Fee Charges:
Gas Permit: Residential Fee: $20.00
Inspection Fee: $30.00
Appliance Fee: $5.00
Replace Hot Water Heater: 30.00
Gas Permit: Commercial Fee: $30.00
Inspection Fee: $30.00
Appliance Fee: $10.00
Replace Hot Water Heater: $40.00
Plumbing Permit Residential: $20.00
Inspection Fee: $30.00
Charge For Each Fixture: $5.00
Replacement Hot Water Heater: $30.00
Plumbing Permit Fee Commercial: $30.00
Inspection Fee: $30.00
Charge For Each Fixture: $10.00
Replacement Hot Water Heater: $40.00
Electrical Permit Fees:
The purpose of the Massachusetts Electrical Code is the practical safeguarding of persons and property from hazards arising from the use of electricity.
Residential - New Construction (includes service):
- Fee is based on the projected building cost as shown on the building permit, first $50,000.00: $150.00
- Each additional $1,000.00 or fraction thereof: $1.00 Additions/Renovations (plus the service if applicable)
Additions / Renovations:
- $50.00 for permit plus $3.00 for each (i.e.: lights, outlets, receptacles, switches, appliances, special equipment, etc)
- Overhead: (Includes 1st panel or main circuit breaker enclosure) $45.00
- Underground: (Includes 1st panel or main circuit breaker enclosure) $85.00
- Each additional panel $20.00
- Temporary Residential Service: $45.00
- Garages: Attached: $60.00, Detached: $100.00
Commercial - New Construction:
- Fee is based on projected building cost as shown on the building permit, First $100,000.00: $300.00
- Each additional $1,000.00 or fraction thereof: $1.00
Additions / Renovations
- $60.00 for permit plus $3.00 for each plug, switch, light, appliance, special equipment
- Services - Changes or Alterations: Each 200 ampere or fraction thereof: $50.00
- Each additional panel: $20.00
- Commercial Temporary Service: $60.00
- Mass utility retro Fit: $65.00
Miscellaneous:
- Swimming pool, in-ground: $85.00
- Swimming pool, above ground: $55.00
- Hot water heater replacement residential: $30.00
- Hot water heater replacement commercial: $40.00
- Burglar/Fire alarm system residential: $45.00
- Burglar/Fire alarm system commercial: $85.00
- Central heat/air residential: $45.00
- Central heater/air commercial: $85.00
- Tel/data systems: $85.00
- Remove & reinstall for siding: $55.00
- Gas piping grounding: $30.00
- Re-Inspection fee: $25.00
Any person failing to give notice by way of an electrical permit within five days of commencing work shall be punished by a fine in addition to the permit fee. This fine shall be equal to the amount charged for the permit fee but in no case shall it exceed five hundred dollars (Chapter 143, Section 31, of the Massachusetts General Laws).